The nearest operational metro station to Shettigere is roughly 28 km away. The nearest planned one is 2.4 km from Godrej MSR City. That gap is the whole story of metro connectivity here. The Blue Line airport metro had reached 72% construction by August 2026, according to Business Today, with phased opening through 2027, and Doddajala is the station that will serve Shettigere.
This guide covers the Doddajala station, the route and interchanges of the Blue Line, the stations that exist today, the expected timeline and what the metro means for daily travel from Shettigere.
The Metro Station Nearest to Shettigere
Doddajala Metro Station, on Phase 2B of the Blue Line, is the closest station to Shettigere. It was earlier planned under the name Trumpet Junction, and the Blue Line's Doddajala depot sits nearby. The station is about 2.4 km from Godrej MSR City, an approximate 8-minute drive.
On the Blue Line, the stations toward the airport run Yelahanka, Bagalur Cross, Bettahalasuru, Doddajala, Airport City and KIAL Terminals. Doddajala is therefore the last or second-to-last stop for most of the line's northern commuters, close to the airport but well placed for the surrounding residential belt.
Blue Line Route and Interchanges
The Blue Line, also called the ORR-Airport Metro Line, runs 58.19 km from Central Silk Board to Kempegowda International Airport with 30 stations. It is built in two sections.
| Section | Route | Length | Stations |
|---|---|---|---|
| Phase 2A | Central Silk Board to KR Pura | 19.75 km | 13 |
| Phase 2B | KR Pura to Kempegowda International Airport via Hebbal and Yelahanka | 38.44 km | 17 |
The line connects with other metro lines at four points.
| Interchange | Connecting line | What it means for a commuter |
|---|---|---|
| Central Silk Board | Yellow Line | Access to south Bengaluru and Electronic City side |
| KR Pura | Purple Line | Link to Whitefield and the city centre |
| Nagawara | Pink Line | Link to the northern and southern city corridors |
| Hebbal | Proposed Orange Line | Future link to Sarjapur and the wider network |
A commuter from Doddajala would ride south through Yelahanka and Hebbal, change at KR Pura for the Purple Line or continue along the Outer Ring Road toward Marathahalli and Silk Board. For the roads and landmarks along that corridor, see the map and location guide.
Existing Metro Stations Near Shettigere Today
Until the Blue Line opens, the working metro network is far from Shettigere. Distances below are approximate road figures.
| Station | Line | Distance from Shettigere | What it means |
|---|---|---|---|
| Yeshwanthpur | Green Line | 27.7 km | Closest working station, mainly useful for the west of the city |
| Peenya | Green Line | 29.1 km | Western industrial belt |
| Baiyappanahalli | Purple Line | 32.1 km | Gateway to the east and Whitefield |
| Benniganahalli | Purple Line | 33 km | East side access |
These distances mean residents rely on cars, cabs and BMTC buses today. A drive to the nearest working station would use up most of the time a metro is meant to save, so these stations are not a practical daily option.
Expected Timeline
Published reports point to a phased opening through 2027, with different sections starting service as they are ready and the full line expected between December 2027 and March 2028. Business Today's August 2026 update put construction at 72%, and officials described the corridor as on schedule for phased opening through 2027.
| Milestone | Timeline in published reports |
|---|---|
| Construction progress | 72% overall by August 2026 |
| First sections opening | Phased, from 2027 |
| Full Blue Line operation | Between December 2027 and March 2028 |
| Doddajala station | Date to be announced by the metro authority |
For a project with possession in December 2030 for Phase 1 and 2031 for Phase 2, the metro is likely to be running well before the first residents arrive. That is a notable point for buyers, since connectivity usually follows handover in new corridors, and here it is expected to lead.
What the Metro Changes for Shettigere
Commute options. Residents who work along the Blue Line, such as in Hebbal, KR Pura or the Outer Ring Road belt, gain an alternative to NH-44. The road stretch between Shettigere and the city is busy at peak hours, and a rail option offers a more predictable journey.
Airport access. The airport is about 9 km from the project by road. The metro adds a transit link for visitors, relatives and anyone who prefers not to drive to the terminal.
Employment reach. Employment hubs near the project, including KIADB Aerospace Park and Devanahalli Tech Park at 6 km and Prestige Tech Cloud at 7.4 km, remain closer by road. Manyata Tech Park is 21.2 km away, and the metro is expected to help residents who commute toward Hebbal and Nagawara.
Property demand. Metro-linked micro-markets tend to see stronger interest from end users and tenants. The Blue Line is expected to lift residential and commercial demand along its northern stretch, including KR Pura, Hebbal, Yelahanka and Shettigere. For what that could mean for rents after handover, see the Godrej MSR City apartments for rent page.
Other Public Transport Around Shettigere
Beyond the metro, buses on the airport corridor and cabs fill the gap today. BMTC services, including airport routes, run along NH-44 and nearby roads. Bettahalsoor Railway Station, about 12.7 km away, serves outstation rail travel. A suburban rail line toward Devanahalli has been planned as part of the wider network, with timelines expected to unfold in stages.
For the neighbourhood itself, including schools, hospitals and daily conveniences, see the Shettigere location guide.
Godrej MSR City and the Metro
Godrej MSR City is a 62-acre township with 39 towers, a 20-acre green zone and over 60% open space. Phase 1 (Barca I) has 1,961 units across 19 acres, and Phase 2 (Barca II) has 602 units across 8.4 acres. Phase 2 3 BHK (2T) units start at ₹1.79 Cr* and 3 BHK (3T) units at ₹1.99 Cr*. The 2 BHK units, which started at ₹1.18 Cr*, are sold out. Phase 3 (Barca III) is in pre-launch with expressions of interest open, and its area, towers, units and pricing are yet to be announced.
The project sits about 2 km from NH-44 and 2.4 km from the Doddajala station, which puts a rail link within a short feeder ride. For news as the metro and the township progress, see the latest news and project updates page.
Verdict for End Users
If you commute along the Blue Line corridor, the metro is a real benefit, and it is expected to be operating before possession. If your office is in the airport and aerospace belt, you will still drive, and the metro is more of a weekend and airport convenience. Until it opens, plan on road travel for everything.
Verdict for Investors
The metro is among the strongest demand drivers for the corridor, and its construction progress supports the case. The risks are timelines that have slipped before, since earlier targets for the line were in 2025 and 2026, and the 2030 to 2031 possession horizon. Treat the metro as an upside to a long-hold position and not as a guarantee on a date.
Plan Your Visit
Drive from the project to Doddajala and note the time, then compare it with your route to work. To discuss availability, pricing or Phase 3, call +91 63668 50754, or see the office address and contact details page.
Frequently Asked Questions
Which metro station is nearest to Shettigere?
Doddajala Metro Station on the Blue Line, about 2.4 km from Godrej MSR City.
Is the metro operational near Shettigere?
Not yet. The Blue Line reached 72% construction by August 2026, with a phased opening through 2027 expected.
What is the Blue Line?
A 58.19 km metro line from Central Silk Board to Kempegowda International Airport with 30 stations, built in Phase 2A and Phase 2B.
Which lines does the Blue Line connect with?
The Yellow Line at Central Silk Board, the Purple Line at KR Pura, the Pink Line at Nagawara and the proposed Orange Line at Hebbal.
Which working metro stations are closest today?
Yeshwanthpur, about 27.7 km away, and Peenya, about 29.1 km away, on the Green Line.
How far is the airport from Godrej MSR City?
About 9 km, roughly a 10-minute drive in normal traffic.
When will the full Blue Line open?
Published reports point to full operation between December 2027 and March 2028.
What is the price of a 3 BHK in Godrej MSR City?
Phase 2 3 BHK (2T) units start at ₹1.79 Cr* and 3 BHK (3T) units at ₹1.99 Cr*.